PSA Quay Cranes

Rehabilitation of Quay cranes at Pasir Panjang Terminal, Singapore

The PSA Cranes were being shifted from from one paint to another and had to be lashed to a barge within the terminal. When they were finally put into position; the welded area on the crane had to be rectified. This was executed with the use of of the SATBlast machine for proper surface preparation before Zinga could be applied.